June 14, 2017: We've been planning these concrete slabs for a while. Only this time, we hired a guy and his team to do the work for us. And they did a great job! Now we have a great place for the boys to play or to park an RV at the side of the house.
The backyard before. We wanted a nice big patio space.
June 19, 2017: The back porch and sidewalk from ADU all poured. The rebar stuck in the concrete is in preparation for the concrete retaining walls Josh and Kaden will build.
No comments:
Post a Comment